Enbridge's Line 3 Replacement is facing a delay. The way I understand it, it had regulatory approval rescinded in Minnesota. (Check facts for yourself)
Pipe is being hauled and stockpiled along the pipeline route already.
Landowner's have received compensation already.
Stripping was supposed to start in August 2016. Stripping can only start in fall when migratory birds are no longer nesting.
Construction crews contracted to start this fall...? Imagine being geared up with machinery and men and being delayed a year.
Wow...
What drives me ****ing nuts is how "CONCERNED" everyone is about safety and WhiteCity/Emerald Park develop a whole ****ing community RIGHT along both sides of the pipeline right of way. A new elementary school built about 500 feet away from a pipeline right away.
Stop the insanity already... and I'm not talking about the building of pipelines...
Pipe is being hauled and stockpiled along the pipeline route already.
Landowner's have received compensation already.
Stripping was supposed to start in August 2016. Stripping can only start in fall when migratory birds are no longer nesting.
Construction crews contracted to start this fall...? Imagine being geared up with machinery and men and being delayed a year.
Wow...
What drives me ****ing nuts is how "CONCERNED" everyone is about safety and WhiteCity/Emerald Park develop a whole ****ing community RIGHT along both sides of the pipeline right of way. A new elementary school built about 500 feet away from a pipeline right away.
Stop the insanity already... and I'm not talking about the building of pipelines...
Comment