Just a thought about the FPC and intials. I am upside down on my Fpc's so I have to give back to the level of the intial. Now let's say the board got a little carried away with the initals, to compete against FPC's, not look bad against US markets etc.
What if 1HRs inital @ 325/tonne
My FPC @ 250/tonne
Final comes in at 315/tonne
I haul a load anytime between now and July 31 I get 325/tonne and send back 75/tonne to net me 250/tonne. Joe pool guy gets 325/tonne and feds make up the difference (10/tonne overpaid) at the end of the year, or does the loss come out of contigency fund because FPC's participants caused massive lossed to the CWB. If this does happen do I get 10/tonne sent to me to equalize the mistake?? HAHA
Is my math correct in this?
Curt
What if 1HRs inital @ 325/tonne
My FPC @ 250/tonne
Final comes in at 315/tonne
I haul a load anytime between now and July 31 I get 325/tonne and send back 75/tonne to net me 250/tonne. Joe pool guy gets 325/tonne and feds make up the difference (10/tonne overpaid) at the end of the year, or does the loss come out of contigency fund because FPC's participants caused massive lossed to the CWB. If this does happen do I get 10/tonne sent to me to equalize the mistake?? HAHA
Is my math correct in this?
Curt
Comment