13 - 15 foot semi rigid drill frame sections with wide packer gangs was not the most ideal configuration for our topography. Gouging and uneven on row packing had it's limitations here.
I made a comment to SF3 about his soil being a lot more forgiving than ours. A moist thick black A horizon supported by a good clay base B and C horizon will beat my soil type(most of it) hands down any day! I'm doing the best i can with what I have, Mother Nature rules.
I made a comment to SF3 about his soil being a lot more forgiving than ours. A moist thick black A horizon supported by a good clay base B and C horizon will beat my soil type(most of it) hands down any day! I'm doing the best i can with what I have, Mother Nature rules.
Comment