• You will need to login or register before you can post a message. If you already have an Agriville account login by clicking the login icon on the top right corner of the page. If you are a new user you will need to Register.

Announcement

Collapse
No announcement yet.

Drilling Technology

Collapse
X
Collapse
 
  • Filter
  • Time
  • Show
Clear All
new posts

    Drilling Technology

    Man,this iron just keeps getting better.

    Rig #417 got traded in on #422.


    The 100-140,000 lb rig market is so congested right now... Rates are low so we pivoted to running 200,000 lb+ rigs.

    Larger crews needed more technical expertise & skill requirements, and higher risk keeps guys out of this market.


    This is a brand-new American Augers 240. Biggest rig built with on board mud pump. Automatic rod loader. Wireless telematics.


    It's safe, fast, quiet, and costs only a little more than a new 8800 lexion.








    #2
    Last bore I did before harvest. 554m long. 48" diameter 11 meters deep.


    Comment


      #3
      Fancy looking piece of iron, does the operator seat swivel or do you climb over the back to sit in it.

      Comment


        #4
        Originally posted by DaneG View Post
        Fancy looking piece of iron, does the operator seat swivel or do you climb over the back to sit in it.


        Swivels 270 degrees and slides in both directions.

        Comment


          #5
          Typically, do they pull or push the pipe through after the boring is done and what would be the maximum distance for boring underground.

          Comment


            #6
            Neat piece of engineering 👍

            Comment


              #7
              Originally posted by rumrocks View Post
              Typically, do they pull or push the pipe through after the boring is done and what would be the maximum distance for boring underground.
              Pull. Because the forces are in your favour, as you pull the pipe in, the drill is being pulled towards the ground. There's a swivel attached to the end of the reamer, and we pull the product in after the hole is completed.

              It takes a bit of force sometimes to pull a pipe in. This drill can exert a direct line pull of 240,000 lbs. The biggest rigs are 2 million lbs. That pipe pulled in at about 75,000 if I remember right... That's more pull than a D10 dozer can muster.


              Bores are getting crazier. They've done 5 km by drilling from each end and intersecting underground. Typically we stay under a km. 500-800m is typical. 800m is a quarter section' worth.

              Nowadays, in sensitive areas whole pipelines are bored. Just dig a connection pit every kilometre or so, and drill again. Never disturb a tree, fish, frog, or shrub.

              Comment


                #8
                Two more questions, what would the cost of boring a km versus trenching.
                How much bigger is the bore size usually, compared to pipe diameter or does that depend on angle change within the bore.
                I'm an inquisitive guy.

                Comment


                  #9
                  But does it have a fridge....

                  No after treatment on the engines and still meets Tier 4 Final?

                  Comment


                    #10
                    Originally posted by Herc View Post
                    But does it have a fridge....

                    No after treatment on the engines and still meets Tier 4 Final?
                    Eu tier 5.

                    MTU diesel engine. Uses def but doesn't Regen and no filter. Pretty neat power plant.

                    Comment

                    • Reply to this Thread
                    • Return to Topic List
                    Working...