Take this post as a challenge to prove various firmly held beliefs about renewable energy projects in Canada.
Let your Grid Tie smart meter (or second best; the honest reading of your bidirectional Utility meter) speak for itself. Report your usage and production of renewable solar/wind/carbon neutral/low impact hydro on any irregular basis to this thread for the next week or so (or longer). Any evidence of exaggeration can be proven by a picture showing the meter reading. "Delivered" and "received" Kwh add useful information.
The object is not to identify anyone; but to provide real data (based on the real world actual production) which can be used to prove or refute past claims.
I'll go first.
Net Metering Project 1....6000 watt Inverter Flare gas cogeneration project ....commissioned first week of July 2020 Digital display 4 Kwh used to yesterday... 22160 Kwh injected into grid to date of yesterday afternoon...... meter read yesterday about 2:00pm . Note new meter installed in July with zero KWH on both channels.... Single phase Inverter deliberately set below continuous rating of 5500 watt output; instead of 6000 max output continuous rating. Pilot project with unknown operating temperature rise etc. Temp rise to less than 100 degree F with fan cooling so should be no issue if output raised almost 10%; but no incentive to change with todays contract.
Net Metering Project #2 Three similar 6000 watt inverter to above; but in a three phase configuration. Actual "smart" meter reading at 4:30 am this morning....212 Kwh used to date from grid...3591Kwh produced/exported since about Nov 25/2020. Inverter produce about 5585 watts continuous; except for one phase set at 1500 watts max (isolation transformer limitation which will be corrected). Note 207Kwh of 212 used came fro usage prior to commissioning new smart meter installed a few weeks previous to inverter(s) startup
From now on I will only report the "rec" and "del" as read from the appropriate meter.
Seeing as how every Utility is securely sealed to prevent tampering...we can all rely on everyone to be honest; and any doubt can be challenged by producing an appropriate photo evidence that doesn't have to disclose any persoonal identification. All that should be of interest is how much electrical energy (if anything) REALLY ever was "rec"eived and "del"ivered .
Who would bet that my two Grid tie commissioned project aren't producing more energy into maybe some other provinces grid...than all the other renewable projects that will get reported to this forum.
Let the challenge begin. Time to put up
Let your Grid Tie smart meter (or second best; the honest reading of your bidirectional Utility meter) speak for itself. Report your usage and production of renewable solar/wind/carbon neutral/low impact hydro on any irregular basis to this thread for the next week or so (or longer). Any evidence of exaggeration can be proven by a picture showing the meter reading. "Delivered" and "received" Kwh add useful information.
The object is not to identify anyone; but to provide real data (based on the real world actual production) which can be used to prove or refute past claims.
I'll go first.
Net Metering Project 1....6000 watt Inverter Flare gas cogeneration project ....commissioned first week of July 2020 Digital display 4 Kwh used to yesterday... 22160 Kwh injected into grid to date of yesterday afternoon...... meter read yesterday about 2:00pm . Note new meter installed in July with zero KWH on both channels.... Single phase Inverter deliberately set below continuous rating of 5500 watt output; instead of 6000 max output continuous rating. Pilot project with unknown operating temperature rise etc. Temp rise to less than 100 degree F with fan cooling so should be no issue if output raised almost 10%; but no incentive to change with todays contract.
Net Metering Project #2 Three similar 6000 watt inverter to above; but in a three phase configuration. Actual "smart" meter reading at 4:30 am this morning....212 Kwh used to date from grid...3591Kwh produced/exported since about Nov 25/2020. Inverter produce about 5585 watts continuous; except for one phase set at 1500 watts max (isolation transformer limitation which will be corrected). Note 207Kwh of 212 used came fro usage prior to commissioning new smart meter installed a few weeks previous to inverter(s) startup
From now on I will only report the "rec" and "del" as read from the appropriate meter.
Seeing as how every Utility is securely sealed to prevent tampering...we can all rely on everyone to be honest; and any doubt can be challenged by producing an appropriate photo evidence that doesn't have to disclose any persoonal identification. All that should be of interest is how much electrical energy (if anything) REALLY ever was "rec"eived and "del"ivered .
Who would bet that my two Grid tie commissioned project aren't producing more energy into maybe some other provinces grid...than all the other renewable projects that will get reported to this forum.
Let the challenge begin. Time to put up