Well look at that. All that expensive hydro Alberta paid for isnt up to the job.
Quebec says it is 15-20yrs away from another hydro project (basically admitting another hydro dam will never be built in this country), instead needs 8000 windmills in the meantime and a 50% increase in baseload. Look at all those hill tops sc****d off for windmills with powerlines trenched up to each one. What an ugly site.
Meanwhile Quebecers asked to skip showers. LOL
--------------------
Quebec says it is 15-20yrs away from another hydro project (basically admitting another hydro dam will never be built in this country), instead needs 8000 windmills in the meantime and a 50% increase in baseload. Look at all those hill tops sc****d off for windmills with powerlines trenched up to each one. What an ugly site.
Meanwhile Quebecers asked to skip showers. LOL
--------------------
Comment